fredag 10 april 2015
TESTING PROCEDURE
TESTING PROCEDURE
What should you expect when a contractor
performs a duct test at your home or
business? The test should take about an
hour from initial setup to completion.
You may be present while the test is being
conducted, although the heating and air
conditioning system must be shut off during
testing. A properly conducted test will not
damage your heating or air conditioning
system or your building.
The contractor will have to attach the duct
tester to the blower compartment of the air
handler or the main return grill using
masking tape. Next the supply registers
and any remaining return grills must be
taped closed. After the duct system is
temporarily sealed, the duct tester fan will
be turned on to pressurize the duct system
to a predetermined level (usually 25 Pascals,
which is 0.1 inches of water column), and the
contractor will adjust the gauges until the
pressure level is stabilized. The contractor
then records the fan pressure and converts
this to a fan flow in cubic feet per minute.
The results will show how leaky your duct
system is and help you and your contractor
decide whether sealing or repair work
is necessary
Prenumerera på:
Kommentarer till inlägget (Atom)
Inga kommentarer:
Skicka en kommentar