Operatives to ensure that the client has had all appliances turned off, pilot lights extinguished, gas valves closed and controls isolated. Cover all kitchen equipment to avoid damage and soilage, using sheeting and boards where necessary.
Stainless steel ceilings
3  Operatives to erect access equipment e.g.. stepladder or ladder in the correct and safe manner. Ladders to be erected at the correct angle of 1:4 (75º). If working between 2-6 metres height ladders must be footed or an approved ladder stopper or stabiliser used.
4  Operatives to wash panels using either a ‘Greenie’ or cloth as necessary.
5  Operatives to then wash off all residue chemical using clean water and clean cloths.
6  When panels have dried, operatives to polish them with kitchen paper and stainless steel polish if required.
Painted – false or clipped tile ceilings
General Note: Ceilings can be emulsion or gloss painted, or have PVC coated tiles suspended as a false ceiling, therefore do not use too much pressure when cleaning as this may damage t