1 SCOPE OF WORK

1 SCOPE OF WORK
(A) The scope of work for this project will include cleaning of all HVAC ductwork and accessories
at the Putnam Elementary School, Middle School and High School. The extent of ductwork to be
cleaned shall be determined by review of available construction documents and field verification.
(B) The Contractor shall be responsible for the removal of visible surface contaminants and
deposits from within the HVAC system in strict accordance with these specifications.
(C) The HVAC system includes any interior surface of the facility’s air distribution system for
conditioned spaces and/or occupied zones. This includes all Heating, Ventilating and Air
Conditioning systems from the points where the air enters the system to the points where the air is
discharged from the system. The return air grilles, return air ducts to the air handling unit (AHU),
interior surfaces of the AHU, mixing box, coil compartment, condensate drain pans, supply air
ducts, fans, fan housing, fan blades, turning vanes, filters, filter housings, reheat coils, and supply
diffusers are all considered part of the HVAC system. The HVAC system may also include other
components such as dedicated exhaust and ventilation components and make-up air systems.
The Kitchen Hood Exhaust systems are not included in the scope of wor